Project Details
This customer wanted a new driveway with a touch of class, so the driveway was removed. The area in front of the garage was dug out and prepped for concrete. Once the concrete was installed, we set the Cobblestones in the concrete. After that, we installed drainage pipe from a downspout on the right of the garage which used to dump water on the driveway and ice would form in the Wintertime. Finally, the new driveway was paved.
Requirements
- Excavation and removal of old driveway.
- Installation of concrete.
- Installation of Jumbo Cobblestones/Jumbo Belgium Blocks.
- Installation of drainage pipe to the rear of the house.
- Install new base material for the driveway.
- Install a new Asphalt driveway.
Town
Glastonbury, CT